Facility is located in West Palm Beach. WE completed a 100 cable retrofit to consolidate the network infrastructure in the administration building to one closet. During the installation, we found over 6 different network hubs scatter in less than a 100 cable length from the main server. We installed a new fiber optic cable to replace a slow network connection that was on a horizontal copper cable run that was over 500’ in length.
We completed a Camera system upgrade that included 14 cameras. The existing cameras were black and white only, replaced with the new color cameras with a wide dynamic range, 640 scan lines of resolution and low lux capabilities due to the door openings and outside locations. Installed a new DVR to capture all of the recording for a longer period of time.